|
100T Crawler Pin Dismantling Machine / Electric Chain Pinning Machine / Excavator Maintenance Sleeve and Chain Pressing Integrated Machine 110V |
|||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||
| Product Overview | |||||||||||||||||||||||||||||
| The excavator sleeve and chain pressing integrated machine is a professional dismantling device for sleeves and chains of various construction equipment such as excavators. The shaft sleeves and chains can be precisely assembled and disassembled through the pressing force, thereby effectively ensuring the assembling tightness and reliability. The pressing device and the manual and electric integrated pump cooperate to conduct pressing operation, so the working efficiency and quality are greatly improved. The machine can be widely used in different industries, such as the machinery manufacturing industry, the machinery maintenance and repair industry, the rail traffic industry and the power industry. | |||||||||||||||||||||||||||||
| Product Parameters | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||
| Attention | |||||||||||||||||||||||||||||
|
Do not touch the running parts during
operation. Do not put the hands into the machine. Do not allow people or objects to be located next to the running parts of the machine. |
|||||||||||||||||||||||||||||
| Product Features | |||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||
|
The sleeve and chain pressing device is
combined with the manual and electric integrated pump perfectly to
conduct the pressing operation, the pressing effect is excellent,
efficient integration of the working procedure is achieved, the
precision control and flexible operation are realized, and the operating
intensity, the occupied space and the total cost are reduced. 銆€ |
|||||||||||||||||||||||||||||
| 銆€ | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
| 銆€ | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
| Operation Method | |||||||||||||||||||||||||||||
| 1. Before operation, carefully check the pressure oil circuit, transmission device and hydraulic pressure, and ensure that the equipment is intact before starting. | |||||||||||||||||||||||||||||
| 2. At least two operators are required to operate the machine cooperatively, and it is prohibited to work alone. | |||||||||||||||||||||||||||||
| 3. Before pressing the sleeve/chain, the flange sleeve/chain and the core must be aligned. | |||||||||||||||||||||||||||||
| 4. If it is necessary to use a rod when pressing the sleeve/chain, the rod must be aligned with the core to prevent slipping and injury. | |||||||||||||||||||||||||||||
| 5. When pressing the sleeve/chain, no one is allowed to stand directly in front of the sleeve/chain, the operators can only stand on the side of the core and keep 1.0m away from the core. | |||||||||||||||||||||||||||||
| 6. After pressing the sleeve/chain, move the core and flange sleeve/chain away from the operation area. | |||||||||||||||||||||||||||||
| 7. After the operation is completed, turn off the power supply and organize the site. | |||||||||||||||||||||||||||||
| Product Display | |||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||
| Item Number (022746): 1 x Crawler Pin Dismantling Machine 100T 110V | |||||||||||||||||||||||||||||
|
You can make
order with no worry. |
|||||||||||||||||||||||||||||
Item #022583
Chain pressing and sleeve pressing machine
Item #022260
Chain pressing and sleeve pressing machine
Item #022485
Chain pressing and sleeve pressing machine
Item #022486
Chain pressing and sleeve pressing machine
Item #022494
Excavator sleeve pressing machine