1.The cork into the heding,the
direction of sets of head must be put right.
2.Place the head on the bottle.
3.The bottle on the plug machine,the location of the first set of
accurate.
4.Put down the handle,the pressure head just in the mouth of the kit.
5.Press down firmly on the handle,press the stopper into the bottle,and
observe the position of the stopper.
6.Remove the ferrule to confirm the position of the plug is well.
|